mhanson
Current Status
No status posted
Older Posts
Team Posts
Posted on 2010-07-27
mykmelez
Done:
* Jetpack
o froze SDK 0.6 and started driving release (released rc1, drafted release notes, triaged bugs, etc.)
o triaged FlightDeck bugs and updated FlightDeck 1.0a3 development plan
o reviewed SDK 0.6 outcome and updated SDK 0.7 development plan
o reviewed a panoply of patches
o chatted w/
+ Atul re: E10S integration, debugging, nightly build horkage, security
+ Drew, bsmedberg re: E10S-compatible context-menu API
+ Dietrich re: 1.0 API set, E10S status, panel patch, FlightDeck.next
+ Irakli re: ES5 compatibility
* Misc
o PTO half day Friday
o reviewed Personas theme compatibility fix (bug 568701)
o Pascal hÃvott egy szupersztárra
Next:
* Jetpack
o release SDK 0.6
o finalize SDK 0.7 plan
o finalize FlightDeck 1.0a3 plan
o propose, finalize E10S-compatible API spec
o propose Window API spec
o finish Panel patch
o rejoice at continuous integration?
Posted on 2010-07-26
atul
Done:
- Created Out-of-process Jetpack SDK Proof-of-concept at http://github.com/toolness/oop-jetpack-sdk-poc
- Discussed OoP PoC and OoP architecture w/ warner and irakli.
- Discussed roadmap for e10s and other work with myk and osunick.
- Fixed bugs to release Jetpack SDK 0.6rc1.
- Created first iteration of HTML5 presentation template for community engagement meetings.
Next:
- Continue discussion of OoP migration with warner and irakli, possibly write a blog post or forum post about it.
- Familiarize community marketing team with HTML5 presentation template.
Posted on 2009-10-20
jresig
Done:
- Lots of traveling and meetings!
- Contacted Arun and Doug regarding the DOM Core 4 spec.
Next:
- Start work on the Selectors API spec draft
- Figure out if DOM Core 4 is worth it.
- jQuery Infrastructure meeting this weekend.
- Review initial jQuery Mobile patch.
- Get TestSwarm off of the VM.
Posted on 2009-10-19
mconnor
Done:
- Short week due to Thanksgiving/travel to Bay Area.
- Labs offsite!
- Some work on Weave Firefox UI
- Dealing with perceived sec implications of Personas integration in Firefox
Next:
- Finish and land new Weave UI for Firefox for pre2
- Fixing followups
- Fennec UI evolution
Posted on 2009-10-19
Pascal
Done:
- [Design Challenge] Setup Jetpack for Learning website [1]
- [PR] Planing Meeting (due to Nicole Loux leaving Mozilla)
- [HR] 1x Onsite Interview, 1x Debrief
- [Other] Website planning meeting
- [Other] Labs Offsite
[1] http://design-challenge.mozilla.org/jetpack-for-learning
Next:
- [Other] Followup to Offsite strategy process
- [Design Challenge] Roll out Jetpack for Learning Challenge
- [Design Challenge] Wrap up Weave Web UI Challenge
- [Design Challenge] Finish planing for next challenges
- [Chocolate Factory] Roll out beta of StackExchange site
Posted on 2009-10-19
kevin
Done:
Can now build Bespin Embedded releases
Next:
Slim down the Bespin Embedded build (currently more than 600K compressed, but not gzipped). More docs Work on CommonJS presentation for JSConf.eu (I'll be giving the presentation at a2div this week.)
Posted on 2009-10-16
aza
Next:
Working on finding a documentation contractor for #jetpack, and then getting them interviewed by @sheppy.