Mozilla Status Board

jboriss@mozilla.com

Current Status - 2014-07-28

Done:

  • Worked on Site Identity spec for implementaiton
  • Sketched wireframe variations for Project N.
  • Finished scoping and pitch document for Project N for steering committee meeting
  • Worked on Australis styling bugs
  • Added new partner booking.com to Tiles, created assets

Next:

  • Finish Site Identity spec
  • Digitize sketched Project N wireframes
  • Add assets to Dropbox
  • Finish bugs for download panel
  • Support Eng followup bugs from last cycle

Older Posts

Member of Projects

Team Posts

rfeeley@mozilla.com 3 days ago

Done:

Next:

  • Finalize In-Content preferences for Saved Logins
  • Create Android password manager flow
  • Add Sign-out guidelines to FxA UX guidelines

jgruen@mozilla.com 3 days ago

Done:

  • worked on chronicle pitch deck
  • FxA Sass Refactor
  • Helped Darrin (a little) with FxA iOS integration

Next:

  • Update/optimize FxA UI for mobile screens
  • Fix FxA Coppa flow
  • More Chronicle

philipp@mozilla.com 3 days ago

Done:

Next:

  • actually finish notes from TC research
  • Prepare for RL/RV meeting in Portland
  • get bugs on file for privacy and search work
  • finally get a better grasp of where we are in terms of passwords (Ryan, let's talk some time this week)

randersen@mozilla.com 3 days ago

Done:

iOS

  • Reading View design specs
  • Final Reading View v1 prototype
  • UR reports

Next:

iOS

  • Finalize Reading View animations/transitions.
  • Share/Send widget
  • FxA
  • Going through bugs-n-stuff

alam@mozilla.com 3 days ago

Done:

  • Android First Run UX and Sync up
  • Passwords UX on Android (cont'd)
  • Bug 1137483: "quick search" for Android
  • Bug 1071730: Search suggestions UI
  • Lots of misc Android bugs

Next:

  • Reading List/ Reader View Android bugs list
  • Bug 1122302: Improve "Send tab" experience in Android
  • Con't with First Run ideas
  • Bug 1087644: Voice input UX clean up
  • Follow up with Doorhangers work

wselman@mozilla.com 3 days ago

Done:

  • Task Continuity: Prep and Fieldwork in Rochester (Wednesday - Friday)
  • Task Continuity: Preliminary analysis for TC-Las Vegas research.
  • Hello: Text analysis review
  • Login/Account Tool: Review of proposal

Next:

  • Task Continuity: Fieldwork archiving
  • Task Continuity: Coding for Rochester
  • Task Continuity: Participant Profiles
  • Login/Account Tool: Begin process of hiring contractor

mmaslaney@mozilla.com 3 days ago

Next:

Bug 1136217 - [ReaderMode][UX] Identify a list of critical RM parsing and style changes changes

Bug 1125237 - [UX] [ReadingList] Design Spike: Define V2 of reading list

Bug 1087621 - [UX] Design for Reading List on Desktop

athornburgh@mozilla.com 3 days ago

Done:

• Test plan for Tiles on New Tab with usertesting.com created

Next:

• Test plan finalized and deployed this week
• Starting specs for updated New Tab experience

agrigas@mozilla.com 3 days ago

Done:

  • completed first draft of final mvp spec work for all aspects of tracking protection work started in collaboration with Philipp. Wiki documentation here: https://mana.mozilla.org/wiki/display/FIREFOX/Polaris+Tracking+Protection+UX
  • Next:

  • schedule copy review for privacy work
  • complete tracking protection experience spec
  • create visual style concepts for removed content when tracking protection is ON to be prototyped for user perception testing
  • Coordination:

  • review spec with Javaun
  • mjaritz@mozilla.com 3 days ago

    Done:

    • review first iteration of RLRV SUMO articles
    • prioritize RLRV v2 work

    Next:

    • consider retrieval of saved and remembered content
    • prepare RLRV v2 content for Portland
    • align with engineering on next steps for new add-on installation flow

    hhabstritt@mozilla.com 3 days ago

    Done:

    Next:

    • Work on finalizing RL/RV copy this week with Matej
    • Expecting to start spring campaign related tasks once details are received (ie: work with Snippets team, /whatsnew, /firstrun, etc)

    Coordination:

    • Meeting with PMMs this week about project briefs to define spring campaign details, priorities, content strategy, etc

    shorlander@mozilla.com 3 days ago

    Done:

    Next:

    • More icons
    • Some design reviews
    • Tracking protection first run tour stuff

    dhenein@mozilla.com 3 days ago

    Done:

    Next:

    • start putting mockups in meta bugs
    • finish quick save interaction
    • go through ui-review queue for iOS
    • moar mockups

    bwinton@mozilla.com 3 days ago

    Done:

    • Reading List:

    • Search Prototype:

      • Get a semi-working build to Aislinn, to test distribution.
      • Get per-provider suggestions showing up.
      • Update the selected engine highlight.
      • Don’t change the default provider when showing suggestions.
      • Show alternate suggestions on hover as well.
      • Mostly fix keyboard navigation.
    • Other:

    Next:

    • Search Prototype:

      • Final polishing on the search provider switcher.
      • Start breaking down some awesomebar autocomplete prototype work.
    • Other:

      • Taking Friday off for my birthday.

    Coordination:

    • Need mockups from Stephen for the new awesomebar autocomplete prototype.
    • Need feedback from Aislinn on what we need to fix in the search provider prototype.

    sfranks@mozilla.com 3 days ago

    Done:

    Hello

    EME

    • Updated Doorhanger mockup
    • Bug 1134513 - [EME] Create a teaching moment on first play of DRM-protected content

    Heartbeat - Bug 1137481 - Modify Heartbeat UX

    Next:

    • Hello Co-Browsing
    • Hello Monetization

    mverdi@mozilla.com 3 days ago

    Done:

    • User testing of the first run experiments we ran. Thank you Gemma and Bill for your help.
    • Rough draft of a report on that testing.

    Next:

    • Working on a new version of the account/sync tour sign up experiment.
    • Spec for new migrator panel design.
    • See if we can do something with the stub installer.

    gpetrie@mozilla.com last week

    Done:

    • Task Continuity: Fieldwork in Nashville & Columbus
    • Task Continuity: Analysis prep work (coding videos, editing photos, compiling participant profiles)

    Next:

    • Task Continuity: Continue analysis prep work (coding videos, editing photos, compiling participant profiles)
    • Fennec First-Run: Discussions around testing

    lconnolly@mozilla.com last month

    Done:

    • Icon for toggling Recommendations Tab
    • Splice 1.1: UI + Distribution Scheduling

    Next:

    • Splice 1.2: Creative entities + targeting (geo/locale/channel) [replace asset tracking sheets]

    ywang@mozilla.com 5 months ago

    Done:

    • Blog post for tablet refresh
    • Schedule meetings for people to sync up
    • Logistics for departure

    Next:

    • Last week logistics
    • Publish the blog post once Anthony is back
    • Connect people together and hand off my design work to Robin and Anthony

    ddemerson@mozilla.com 7 months ago

    Done:

    • Presentation
    • Interny stuff

    Next:

    • Theme switching for vertical tabs
    • Finishing up notification and toolbar styles for vertical tabs
    • Leaving :(

    ibarlow@mozilla.com 7 months ago

    Next:

    • UX backlogging
    • Search work with Anthony
    • Robin (new designer) starts next week, yay!

    jboriss@mozilla.com 7 months ago

    Done:

    • Worked on Site Identity spec for implementaiton
    • Sketched wireframe variations for Project N.
    • Finished scoping and pitch document for Project N for steering committee meeting
    • Worked on Australis styling bugs
    • Added new partner booking.com to Tiles, created assets

    Next:

    • Finish Site Identity spec
    • Digitize sketched Project N wireframes
    • Add assets to Dropbox
    • Finish bugs for download panel
    • Support Eng followup bugs from last cycle

    zfang@mozilla.com 8 months ago

    Done:

  • Light-weight Themes in customization
  • Next:

    • Finish light weight themes
    • Wrap up feature promotion plan

    abc@mozilla.com 11 months ago

    Done:

    • Idea sketches/wireframes

      • Bug 762298 - Request: Bookmark organization and or sorting
      • Bug 972193 - Allow folder management in Fennec bookmarks UI
      • Bug 971922 - Lack of History Management in History 'Tab' confuse users
    • Sketches for redesign to include changing and resetting passcode

      • Bug 985637 - Protect payment information with passcode

    Next:

    • Refine designs on all misc bugs from last week
    • Tabbed browsing - Idea sketches (spilled from last week)
    • PDF.js bugs (get some feedback on bugs split & post)

    vtsatskin@mozilla.com last year

    Done:

    Next:

    • User Testing

      • Refine "unresponsive script" pilot and launch
      • Start developing pilot for in-content error messages
    • Internet Connectivity and Work Offline Mode

      • Determine current status of work to get to working state
      • Define work offline fully (from feedback)
    • Metro

      • Higher fidelity prototypes from existing paper prototypes.
    • More FxOS Rocketbar User Testing analysis

    yuan@mozilla.com last year

    Done:

    [Sorry for not being here in person. Trying to get a few hours sleep before all the must-go mtgs] Worked on two HTML5 concept prototypes for Android tablet refresh sprint #1: [1]http://tinyurl.com/p953pnz [2]http://tinyurl.com/qb4y8ag Finished testing script on usertesting.com. Draft:http://goo.gl/MiJepk Prioritized and filed main UX work for Metro v2

    Next:

    Finish tablet prototype 3 for sprint #1 Launch tests on usertesting.com Celebrate the year of horse! (PTO from 01/31 till 02/03)

    Coordination:

    Metro launch kick-off mtg with PR and marketing Tablet sync up with Ian

    aganesan@mozilla.com last year

    Done:

    • Form Auto-fill: Ground research

    Next:

    • Form Auto-fill: Consolidate research findings

    Coordination:

    • PDF.js: Anthony Lam for visual design, Engineering & Product for development

    mdeboer@mozilla.com last year

    Done:

    • Australis: bug 900162, New bookmark drop-down panel should use platform-consistent styling when in the toolbar. Almost done.
    • Australis: bug 919965, DnD feedback in the panel is confusing. In progress.
    • Australis: mentored bug 922003, Move panelMenu gutter width to a constant next to menuPanelWidth
    • Findbar: bug 666816 regressions fixing & reviews. In good shape!
    • Other: bug 873126, Introduce a common JS Assert library

    Next:

    • Australis: work on P3/ P4 bugs
    • Findbar: track regressions and post new patch for bug 257061
    • Other: land(?) bug 873126, Introduce a common JS Assert library